GEROtec Fire-Main pressure pipe made of PE100-RC according to DIN and EN standards | Single-layer media pressure pipe with smooth ends | Optionally two-layer pipe or with dimensionally added protective jacket
Polyethylene pipe in black with red longitudinal stripes | Optionally in black and coloured outer layer | Media pressure pipe and protective jacket with complete metre marking in accordance with DVGW
Pressure pipe for fire water distribution | for underground installation in accordance with the standards and regulations listed below | installation in open trenches with and without sand bedding | suitable for trenchless installation methods in accordance with DVGW regulations
Suitable for point loads (highest resistance to slow crack grow) | Permanent batch control of PE100-RC materials | Processing using the butt welding method without prior cutting back of the protective jacket
Type 1 and 2: Pressure pipe made of PE100-RC according to the KRV e.V. positive list | Type 1 or Type 2 according to PAS 1075 Type 3: Pressure pipe made of PE100-RC according to the positive list of KRV e.V. | Protective jacket made of modified polyolefin compound | System pipe type 3 according to PAS 1075
This product is also available with ISCC Plus sustainability certification on request. We have summarised all the information for you here -> ISCC Plus
When laying in a sand bed, the excavated material must be replaced with a sand bedding in accordance with DIN EN 805. Restrictions on the grain sizes of the bedding material must be observed.
Without sand bedding
Due to the verification by an independent testing institute, the installation is possible without a sand bed. This eliminates the additional expense of replacing the excavation with a sand bedding in accordance with DIN EN 805 (transport, landfill).
Ploughing
In the ploughing method, the soil is displaced by a plough blade and the pipeline is placed on the bottom of the soil.
Milling
In the milling process, a pipe trench is cut into the subsoil by machine and the pipeline is laid on the bottom of the trench.
Pipe bursting
Static pipe bursting is the renewal of the old pipeline along the same of the old pipe route, which is shattered by the bursting head and the remaining fragments are pressed into the surrounding soil.
Horizontal Directional Drilling (HDD)
The new installation by HDD is usually carried out in three successive work steps. With the continuous pilot borehole, which is controlled by positioning the route is determined. This is followed by the widening of the borehole and the pulling in of the pipe string.
Relining
In the case of relining with annular space, the new pipe string with a smaller cross-section is pulled into the cleaned old pipeline using a pull-in device.
Soil Displacement Method
In the soil displacement method, a pneumatically operated displacement hammer, a so-called "rocket", is used to excavate an underground cavity. The new pipeline is then pulled into it.
Want to find out more? We look forward to hearing from you.
This website uses cookies. Some of them are necessary, while others help us to improve this website and your experience. I agree and can revoke or change my consent at any time with effect for the future.